DPW Facility Project

The Longmeadow Department of Public Works Facility was constructed in 1931 and is in a significant state of deterioration.  Efforts to replace the old facility have been considered by the town for over 30 years.  Two separate Town Meetings  have provided appropriations to complete the site selection and schematic design of a new facility.  This page is intended to be the document repository for this important project.  Documents will include past studies, recent engineering work, public presentations that have been made about the project, and other important information.  Please use the Notify Me feature on the website to receive a message when this page is updated.  


If you have any questions about the documents or the project in general, please contact Town Manager Stephen Crane at 
(413) 565-4110.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20
  21. 21
  22. 22
  23. 23
  24. 24
  25. 25
  26. 26
  27. 27
  28. 28
  29. 29
  30. 30
  31. 31
  32. 32
  33. 33
  34. 34
  35. 35