Water Sewer Rate Study

A Town of Longmeadow staff team was convened in 2008 to develop a capital plan for the water and sewer systems and to explore water and sewer rate options.  The staff team was comprised of Town Manager Robin Crosbie, Director of Administration and Finance Paul Pasteczyk, Director of Public Works, Mike Wrabel, Assistant Director of Public Works for Water and Sewer Operations Pete Thurber, and Town Engineer, Thom Martens.  The Team prepared a report that was presented to the Select Board in January 2009 and presented the findings at a public forum in February 2009.  The Report and Presentation are available below.

Water and Sewer Rate Options Presentation 2/11/09

(Does not constitute the full report. For full report see Water and Sewer Rate Options.)

Water and Sewer Rate Option