![]() |
|||||||||||||||
|
OTHER LINKS |
|
||||||||||||||
|
1
|
Executive Summary |
|
2
|
Justification
of Proposed Project |
|
3
|
Existing
Conditions 3.1 Existing Conditions 3.2 Site Analysis 3.3 Geotechnical Report 3.4 Hazardous Materials Report |
|
4
|
Educational
Program Needs 4.1 Longmeadow School District Standards and Policies 4.2 Longmeadow High School Goals and Values 4.3 Visioning Report Executive Summary 4.4 Functional Relationship Diagrams |
|
5
|
Development
and Evaluation of Alternatives 5.1 Alternative Options 5.2 No Build Option 5.3 School Assignment Practices and Available Space 5.4 Underutilized or Vacant Spaces 5.5 Rental or Acquisition of spaces for School Use 5.6 Tuition agreements with adjacent school districts 5.7 Evaluation Factors, Matrices and Ranking 5.8 Educational Specifications / Space Summaries (Options 2A-1 and 2B) 5.9 Preliminary Cost Estimates (Options 1B, 2A-1 and 2B) |
|
6
|
Preferred
Alternative 6.1 Preferred Option 6.2 Conceptual Site Plan and Floor Plans 6.3 Detailed Scope and Program 6.4 Outline of Major Building Systems 6.5 Sustainable Design Goals 6.6 Permitting Requirements 6.7 Budget Statement for Educational Objectives 6.8 Total Project Budget and Form 3011 6.9 Projected Cash Flow 6.10 Design and Construction Schedule and Phasing Plan |
|
7
|
Appendix 7.1 Visioning Report 7.2 Program Meeting Notes 7.3 Existing Construction Documents: Floor Plans 7.4 Existing Construction Documents: Exterior Elevations |